• Home
  • Products
    JKWF Hybrid reactive power compensation controller
    JKWF series Hybrid reactive power compensation controller integrates the functions of Monitoring grid ,harmonic protection, compensation and fault warning...
    YBYKXB Resist harmonic intelligence switch
    YBYKXB Anti harmonic intelligent switch is Application of advanced compensation measurement and control technology,All electronic, intelligent, high performance dynamic compensation switch....
    YBYCRz Capacitors
    YBYCRz series cylinder type self-healing low voltage power capacitor,use German treofan material, with the most advanced manufacturing processes and equipment produced....
    Quality assurance of power quality components
    Rigorous, precise quality inspection is the focus of the work of AIA Yi, from the beginning of the screening test material to assembly line inspection, installation testing, etc. process through the digital monitoring strictly, each process into products...
    YBYFCP优电节能装置
    以电力电子技术为核心,以全面解决电能质量问题,提高供电可靠性为目标的多功能装置...
    Quality assurance of compensation filter unit
    Harmonic generator for real simulation, using harmonic source and three level test bench to ensure product quality, and strive to bring customers safe, high-quality products...
    有源电力滤波器YBYAPF
    采用了一种全新的全数字化PWM电流跟踪控制算法,确保设备有极高的电流跟踪精度,从而实现优秀的补偿效果...
    Quality assurance of active module
    Harmonic generator for real simulation, using harmonic source and three level test bench to ensure product quality, and strive to bring customers safe, high-quality products...
    YBYTU800 Harmonic monitor
    The product integrates data collection, statistics, communications, power grid harmonic analysis, harmonic alarm and other functions....
    Quality assurance of harmonic monitoring platform
    Rigorous, precise quality inspection is the focus of the work of AIA Yi, from the beginning of the screening test material to assembly line inspection, installation testing, etc. process through the digital monitoring strictly, each process into products...
  • Cases
    The power distribution system of drilling platform has been powered by generators, and has been powered by electricity. Now, the power supply is provided by the power grid. Because of the large amount of harmonic currents generated by DC motor and frequency conversion motor, dynamic reactive power compensation and harmonic control are needed. The frequent start and stop of the motor causes great interference to the power grid
    The main load equipment is the frequency converter. Because of the large harmonic current (especially the 5 and 7 harmonics) produced by the load, the voltage and current of the system will be distorted, which will affect the normal operation and safety production of the equipment. The input side of the inverter is a nonlinear rectifier circuit, which affects the waveform of the power supply. The output side voltage, current, non sinusoidal or incomplete sine wave are rich in harmonics.
    Container terminal loads are mostly cranes, which are impulse loads, with large amplitude and obvious voltage drop. Especially during the whole process, flickering and voltage collapse are very obvious. The power factor of the motor is very low during starting up. This impulse reactive power will make the grid voltage fluctuate violently, even even the users connected to the same power grid can not work normally.
    In the port industry, the loading and unloading bridges and the belt conveyer are widely adopted by AC frequency converter and DC rectifier. This kind of load is a typical nonlinear load...
    Through the effective protection of the harmonic control after the safe use of transformers, power distribution cabinets, and equipment, prolong the service life of the equipment; the utility grid device to produce additional power consumption is reduced; improve the efficiency of electricity charging equipment, battery charging protection in the process of safety; greatly reduces the harmonic current into the power grid, to avoid the interference of adjacent power supply system.
    After the active filter is put into operation, the total current distortion rate is reduced to 0.75%. The quality of the power grid has been greatly improved, which effectively protects the normal operation of the equipment.
    The total current distortion rate is reduced to 4.78%, the distortion rate of each subharmonic is within 1.5%, and the waveform of the non sinusoidal wave before the treatment is a sine wave. It can be seen that after the input of the filter, the harmonic of the system has been well suppressed, improving the reliability of the power supply system, eliminating the hidden trouble of the influence of the system harmonic on the communication system, and receiving good results.
  • Service support
    we will take any of your needs and consultations seriously and welcome you to contact us......
    Professional engineers provide comprehensive and systematic technical training and operation guidance for customers, including fault diagnosis, equipment commissioning, equipment maintenance, product selection, and overall solution, to meet diverse needs of different types of customers.
    In order to solve your technical problems more quickly, please consult the acquisition support - common question answer FAQ content....
    To understand the more comprehensive electrical products and model parameters of YBY electric, welcome to download the album of related products.....
    Download the product certificate from YBY electric, product patent certificate, 3C certification, CQC and other certificates…....
    YBY provides professional product knowledge and solutions to help enterprises cultivate professional talents, improve the overall technical ability, and actively assist the continuous development of enterprises.......
    Related products and services, the company according to your actual needs in twenty-four hours or an agreed time to provide on-site technical service personnel. As required, please try to provide detailed information so that we can better serve you.
    the company according to your actual needs in twenty-four hours or an agreed time to provide on-site technical service personnel. please try to provide detailed information so that we can better serve you.
    When you have any comments and suggestions about our products, packaging, transportation and customer service service, can be put to us, we will be the first time response, give you a professional, efficient and satisfactory service. As required, please try to provide detailed information so that we can better serve you.
    Related products and services, the company according to your actual needs in twenty-four hours or an agreed time to provide on-site technical service personnel. As required, please try to provide detailed information so that we can better serve you.
  • Partner
  • About us
Login

Product Series

Focus on reactive power compensation,Harmonic control and other electrical fields;Research and development, production, manufacturing, sales, service in one new tech enterprises ;Building a complete, efficient and innovative power optimization solution

Cases

News

About us

Contact us

  • 0755-83248085
  • szyby@china-yby.com
  • Online message
  • The second floor, new world industrial city comprehensive building, Baer Road, Bantian, Longgang District, Shenzhen

For the country invited partners

OEM partners and agents

0755-89584873

0755-895848730755-89584873
E-mailliuxw@china-yby.com
Online InquiryOnline Inquiry
Wechat